GPM Checks Out Thruster Performance
Today, the Global Precipitation Measurement mission Core Observatory successfully fired its thrusters for five seconds to check out the thruster performance. This type of maneuver, called a delta-V, changes the velocity of the spacecraft to adjust the altitude of its orbit. Today's delta-V resulted in only a very slight change in the orbit, but will help the GPM team assess and calibrate the thruster performance.
By contrast, yesterday the team pulsed each maneuvering thruster 3-6 times, but for only 100 milliseconds each time. This was long enough to make sure the thrusters were working, but not enough to calibrate them.