On Tuesday Nov. 13, 2012, the GPM core observatory was moved
from the clean room to the thermal vacuum chamber. The spacecraft, wrapped in
protective blankets, made the short trip by crane across the testing facility
where it was then lowered into the 40-foot (12 meter) diameter test chamber.