V04 Processing for GPM Near-Realtime (NRT) is Scheduled to Begin
Late on March 2, 2016, the GPM NRT system will begin using V04 algorithms for: Level 1B GMI Level 1C GMI Level 1 Radar Level 2 Radar Level 2 Combined V04 is the first version that uses GPM as the calibrator for the constellation rather than TRMM. The GPROF database is built using the combined observations. GMI is extremely well calibrated and the brightness temperatures in 1B and 1C are an important improvement over those in V03. V04 also made improved retrievals in the Ku, Ka, and DPR Level 2 products. Combined has also made retrieval improvements in this version. GPROF the algorithm used for
